Poussard v Spiers (1876) 1 QBD 410
Madame Poussard entered a contract to perform as an opera singer for three months. She became ill five days before the opening night and was not able to perform the first four nights. Spiers then replaced her with another opera singer.
Held:
Madame Poussard was in breach of condition and Spiers were entitled to end the contract. She missed the opening night which was the most important performance as all the critics and publicity would be based on this night.
Back to lecture outline on conditions, warranties and innominate terms
Back to lecture outline on contract remedies